We were commissioned with the complete supply and installation of a new production hall with connected office building and social wing.
The roofing was carried out using Hoesch Isodach integral-n sandwich elements with concealed fastening. A continuous skylight with integrated smoke and heat extraction flaps was installed in the production hall.
The production hall is fitted with a crane runway for supporting a 5 tons single girder gantry crane.
Production hall
- Area: 40,0 x 17,5 m
- Height: 6,40 m
Office building
- Area: 10,0 x 12,5 m
- Height: 6,40 m
Crane runway
- 5 tons load capacity
- 5.50 m hook height
Steel tonnage
Insulation roofing elements
Skylight
- including smoke and heat extraction systems 30.0 x 2.5 m
- 5 tons gantry crane with 17.0 m track
Petry Wendomat
With the Wendomat, you save up to 40% of time in the welding department.
More information
Stahlbau Petry in business more than 75 years
A term for steel structures and further development with new technologies.
More information
ISO9001 Certification
since 1997 in the area of design, production and installation in steel, industrial and complete construction
More information